Today we continued with building the roof for the carport. We have another day or so before we strap, sheet, and get ready for the roofing to arrive.
Aussi Special Force's Tour of Duty Complete
Thursday, 20 September 2012
Wednesday, 19 September 2012
Details..Details....
Tuesday, 18 September 2012
Sunday, 16 September 2012
We're almost covered.
Greetings everyone, just a quick post to say, that by the end of Today we should be complete with the roof sheeting. Unfortunately, we are wait for the metal roofing material to arrive on the 25th. Until then we will be sporting a flash orange tarp!
Friday, 14 September 2012
Report from the Field
The last seven days have been very productive. We have been in full attack mode and have almost completed the second floor framing.. Today we'll be installing the roofing joists and roughing in the sky lights. Tomorrow, hopefully, we'll begin sheeting the roof. A special thanks to the Hunters and Team Aussi.
Monday, 10 September 2012
Sh*#T Flows Downhill.
As it is said: "Sh*#T Flows downhill". in order to accommodate the saying we have started the construction of the septic system. The large hole in the ground is not for our swimming pool, it's the location for the Tank that will contain the black and grey water as it is broken down. Then the waste water will be pumped by a high pressure pump into the two runs of "Leech Field" seen in the black plastic tunnels. The waste water is sprayed into those tunnels and allowed to aerate back into the Earth to decompose naturally and to help the environment. :-)
Sunday, 9 September 2012
Aussi Special Forces Arrive!
Encrypted communications were required to re-task Commander Verdo, Aussi
Special Forces. He air dropped on Friday @ 1500. Once on site we
re-tasked him to command Operation Sub-flooring. Within 48 hours we
completed the operation and now prep'd, will proceed with operation "
Build the Box higher". Monday is the scheduled deployment. We are a
Green for Go! Check back for reports from the field.
Wednesday, 5 September 2012
Joist-Ho!
Monday, 3 September 2012
Beam me up!
Yeah, I know.... bad Star Trek reference. But check out the photos of Day 2 and 3. Main beam installed. The next few days Virginia and I will be installing the joists for the Second floor.
Saturday, 1 September 2012
Framing: Day One.
To start our framing, my buddy Doug called in reinforcements! His
brother Bill and his lovely wife Barb. All of them have been a
fantastic help. Doug's building knowledge and Bill-n-Barb's enthusiasm
and cleanliness! Check out day one's progress.
C-ment boys!
We had a couple of guys come in to "polish" our C-ment. and "man do I have to tell ya" They did a fantastic job! The finish looks great!