Saturday 12 September 2015

Drainage Control Version 2.

As you may recall. (Or you can read blog updates from last fall). We needed to add some drainage to control the winter rains. After the extensive curtain drain system we built, we were able to control 80% of the water,  We've decided to add a little concrete barrier to direct the last 20% of water.  Below, the build process, we'll post again once we back fill and gravel the walk around.






Summer is Over

Well.... Here is the excessively over due blog update for the summer of 2015.  The focus for us, was to finish the siding, which I've been dreading due to the angles and tight working location. Below, before and after shots.